CEGARA | Industrial Quality Inspection CRM
CEGARA | INDUSTRIAL QUALITY INSPECTION CRM
Executive dashboard · Sorting / Rework / Scrap · México · USA · China
Project Setup + Daily Capture
Industrial Quality · Engineers view
These fields are reused in every report (Outlook + Excel). Estos datos se reutilizan en todos los reportes (Outlook + Excel).

• BURR, TORQUE WRENCH REWORK, OXIDE = Rework (become good pieces, do not reduce accepted).
• DAMAGED PART = Scrap / Rechazo (is subtracted from accepted). • Accepted = Inspected − Damaged. · Rework = BURR + TORQUE + OXIDE.
Executive Summary / Resumen Gerencial
Period / Periodo: — Rows / Filas: 0
Total Inspected
0
Cantidad total inspeccionada
Accepted (OK)
0
Inspected − Damaged
Rework
0
BURR + TORQUE + OXIDE
Scrap / Rechazo
0
DAMAGED PART
Quality logic / Lógica de calidad:
• Reworked pieces (BURR, TORQUE, OXIDE) are considered recovered capacity, not scrap. • Only DAMAGED PART hits customer scrap KPI. • This view is designed for Quality Engineers and Plant Management.

Aggregated defects / Defectos acumulados

Project snapshot / Resumen del proyecto

Customer:
Contact:
Site / Planta:
Service:
Parts:
Report link:

Daily detail / Detalle por etiqueta

Date Shift Plant PN Pallet Label Inspected BURR TORQUE OXIDE DAMAGED Rework Accepted Comments Evidence Action