ISO 9001:2015 · REPSE · 844 350 2713 · sales@cegara.com.mx
CEGARA Group 844 350 2713 Quote

GP-12 and safe launch in Mexico and Texas

Reinforced inspection during production start-ups, engineering changes and critical periods.

The first months of a launch carry the highest risk. With GP-12 (Early Production Containment) we add a reinforced inspection that catches defects before material leaves your plant.

Our staff joins your process, verifies critical characteristics and feeds information back to production so problems are fixed at the source.

When do you need it?

  • Launch of a new part number or program
  • Engineering, process or supplier change
  • Line restart after an extended shutdown
  • Your customer requires GP-12 or a launch inspection

What is included

  • Inspection plan based on your critical characteristics

  • Dedicated staff at your GP-12 station

  • Logging of findings and feedback to production

  • Defect trend reports

  • Support until exit criteria are met

FAQ

Questions about gp-12 / safe launch

What is GP-12?

GP-12 (Early Production Containment) is a reinforced inspection during production start-up, engineering changes or critical periods, to catch defects before material ships.

How long does GP-12 last?

Your customer defines it. It usually stays in place until a defect-free period or volume is reached and the process is shown to be stable.

Coverage

Where we offer gp-12 / safe launch

Coahuila

Saltillo · Ramos Arizpe · Derramadero · Ciudad Acuña · Torreón · Piedras Negras

Nuevo León

Monterrey · Apodaca · Santa Catarina · Guadalupe · Escobedo

Bajío and central Mexico

Querétaro · San Juan del Río · Celaya · Salamanca · Irapuato · Silao · León · San Luis Potosí · Aguascalientes

Texas, USA

Laredo · Dallas–Fort Worth · San Antonio · Austin · Del Rio

Facing a quality issue today?

Tell us what is happening and get a technical and commercial proposal in less than 1 hour.